top of page
Josh Lee
Writer
Director
More actions
Profile
Join date: Jul 4, 2025
Posts (4)
Mar 18, 2026 ∙ 4 min
Case Study: Fairwater Leisure Centre – Emergency AHU & Heating Control Upgrade
Project Overview Fairwater Leisure Centre is an important community facility in South Wales, providing swimming lessons, sports facilities, and activity spaces for local schools and residents. When the site's ageing control infrastructure failed, the centre was forced to close while emergency investigations and repairs were undertaken. Our team was brought in to assess the existing control system, identify the causes of failure, and provide both short-term and long-term recommendations to...
38
0
Feb 26, 2026 ∙ 2 min
Case Study: Liquid Heating & Pumping Control System for Export to South America
Electrical & Control System Integration for a Temperature and level Critical Bitumen/Oil storage tank Installation PSL Controls recently delivered the electrical and control system package for a bitumen storage, heating and pumping installation manufactured in the UK for export to Suriname. The tank structure and pipework design were developed and supplied by TEC Container Solutions, with PSL Controls responsible for the complete electrical installation, trace heating integration, control...
32
0
1
Feb 3, 2025 ∙ 2 min
Control Panel Design: 5 Common Mistakes and How to Avoid Them
5 top points to consider when design and building a control panel
112
0
bottom of page
