Why Factory Acceptance Testing (FAT) Matters More Than You Think
When investing in a bespoke control panel or automation system, it's natural to focus on the finished product. However, one of the most important stages of any project takes place before the equipment ever reaches site: Factory Acceptance Testing (FAT). A thorough FAT helps identify issues early, confirms that the system performs as intended and gives customers confidence that installation and commissioning will run as smoothly as possible. What Is Factory Acceptance Testing?

Harriet Lee
1 day ago2 min read


Case Study: Camber Sands Holiday Park – Leisure Pool Control Panel Replacement Project Overview
Modern PLC-based control panel replacement at Camber Sands Holiday Park, delivering reliable automated sequencing of pool features, improved safety for lifeguards, and zero callouts since installation.

Harriet Lee
Mar 273 min read


Case Study: Fairwater Leisure Centre – Emergency AHU & Heating Control Upgrade
Project Overview Fairwater Leisure Centre is an important community facility in South Wales, providing swimming lessons, sports facilities, and activity spaces for local schools and residents. When the site's ageing control infrastructure failed, the centre was forced to close while emergency investigations and repairs were undertaken. Our team was brought in to assess the existing control system, identify the causes of failure, and provide both short-term and long-term recom

Josh Lee
Mar 184 min read


Control Panel Design: 5 Common Mistakes and How to Avoid Them
5 top points to consider when design and building a control panel

Josh Lee
Feb 3, 20252 min read